INDIA ELECTRON EXCHANGE

         NARORA APS (UNIT-1 of 220 MW) reported out from 19-Jan-2012 to 24-Feb-2012 due to turbine problem.          DCRTPP (UNIT-2 of 300 MW) reported out since 25-Sep-2011 due to electrical fault.          RGTPP (UNIT-2 of 600 MW) reported out from 21-Feb-2012 to 12-Mar-2012 due to general maintenance.          SURATGARH STPS (UNIT-1 of 250 MW) reported out since 20-Feb-2012 due to generator fault.          ROSA TPS (UNIT-3 of 300 MW) reported out since 02-Jan-2012 due to testing work.          INDIRA GANDHI STPS (UNIT-1 of 500 MW) reported out since 17-Feb-2012 due to electrical fault.          ANPARA-C TPS (UNIT-2 of 600 MW) reported out since 07-Feb-2012 due to coal shortage.          ADANI POWER LTD (UNIT-3 of 330 MW) reported out from 16-Feb-2012 to 04-Mar-2012 due to low vacuum.          ADANI POWER LTD (UNIT-6 of 660 MW) reported out from 18-Feb-2012 to 22-Feb-2012 due to PA fan problem.          ADANI POWER LTD (UNIT-8 of 660 MW) reported out from 21-Feb-2012 to 23-Feb-2012 due to boiler tube leakage.          GANDHAR GPP (UNIT-3 of 219 MW) reported out since 09-Feb-2012 due to less requisition.          SGTPS (UNIT-5 of 500 MW) reported out from 17-Feb-2012 to 22-Feb-2012 due to boiler tube leakage.          BHUSAWAL TPS (UNIT-4 of 500 MW) reported out from 17-Oct-2011 to 31-Mar-2012 due to testing works.          KAPARKHEDA TPS (UNIT-5 of 500 MW) reported out from 13-Feb-2012 to 22-Feb-2012 due to low vacuum.          SIPAT STPS (UNIT-2 of 660 MW) reported out from 20-Feb-2012 to 22-Feb-2012 due to boiler tube leakage.          SUGEN CCPP (UNIT-2 of 380 MW) reported out since 11-Feb-2012 due to low demand.          RGPPL (UNIT-1B of 320 MW) reported out since 20-Feb-2012 due to less requisition.          RGPPL (UNIT-3A of 320 MW) reported out since 21-Feb-2012 due to gas shortage.          RGPPL (UNIT-3B of 332 MW) reported out since 04-Feb-2012 due to less requisition.          KAKATIYA TPS (UNIT-1 of 500 MW) reported out since 18-Feb-2012 due to boiler tube leakage.          NEYVELI -II STG II (UNIT-1 of 250 MW) reported out since 06-Feb-2012 due to economiser tube leakage.          UDUPPI (UNIT-2 of 600 MW) reported out since 29-Jan-2012 due to PCB clearance awaited.         

Bilateral Trade Summary (Region)

Note :- This is a Sample Product.

The above charts try to give a detailed overview of the Bilateral Trade scenario in the Region, for a given time duration. This analysis is a combination of three charts of which, the first chart shows the trend of day to day purchases and sales happening in the region, the second chart shows the different states in the region which are buying power through the Bilateral Mode while the last chart summarizes those states which are selling power during the same duration. In the Bilateral OA Purchases Chart, if we start from the center of the chart, the first layer shows all the states involved in purchase of power through the Bilateral Route. The 2nd layer shows the Traders through whom that power is being purchased. (If the purchase is direct in nature i.e without the involvement of traders, the state Discom/SEB name appears in this layer). Finally the 3rd layer gives details about the volume of these transactions in MUs. Similar to this the Bilateral OA Sales Chart talks about the selling states in the region and their respective sale volumes. As evident, the size of each section reflects the magnitude of sale happening through that state & trader. The overall sales volume has been mentioned at the center to give a picture of the overall trade volume though the STOA route for the region.

 

RelatedProducts