INDIA ELECTRON EXCHANGE

         NARORA APS (UNIT-1 of 220 MW) reported out from 19-Jan-2012 to 24-Feb-2012 due to turbine problem.          DCRTPP (UNIT-2 of 300 MW) reported out since 25-Sep-2011 due to electrical fault.          RGTPP (UNIT-2 of 600 MW) reported out from 21-Feb-2012 to 12-Mar-2012 due to general maintenance.          SURATGARH STPS (UNIT-1 of 250 MW) reported out since 20-Feb-2012 due to generator fault.          ROSA TPS (UNIT-3 of 300 MW) reported out since 02-Jan-2012 due to testing work.          INDIRA GANDHI STPS (UNIT-1 of 500 MW) reported out since 17-Feb-2012 due to electrical fault.          ANPARA-C TPS (UNIT-2 of 600 MW) reported out since 07-Feb-2012 due to coal shortage.          ADANI POWER LTD (UNIT-3 of 330 MW) reported out from 16-Feb-2012 to 04-Mar-2012 due to low vacuum.          ADANI POWER LTD (UNIT-6 of 660 MW) reported out from 18-Feb-2012 to 22-Feb-2012 due to PA fan problem.          ADANI POWER LTD (UNIT-8 of 660 MW) reported out from 21-Feb-2012 to 23-Feb-2012 due to boiler tube leakage.          GANDHAR GPP (UNIT-3 of 219 MW) reported out since 09-Feb-2012 due to less requisition.          SGTPS (UNIT-5 of 500 MW) reported out from 17-Feb-2012 to 22-Feb-2012 due to boiler tube leakage.          BHUSAWAL TPS (UNIT-4 of 500 MW) reported out from 17-Oct-2011 to 31-Mar-2012 due to testing works.          KAPARKHEDA TPS (UNIT-5 of 500 MW) reported out from 13-Feb-2012 to 22-Feb-2012 due to low vacuum.          SIPAT STPS (UNIT-2 of 660 MW) reported out from 20-Feb-2012 to 22-Feb-2012 due to boiler tube leakage.          SUGEN CCPP (UNIT-2 of 380 MW) reported out since 11-Feb-2012 due to low demand.          RGPPL (UNIT-1B of 320 MW) reported out since 20-Feb-2012 due to less requisition.          RGPPL (UNIT-3A of 320 MW) reported out since 21-Feb-2012 due to gas shortage.          RGPPL (UNIT-3B of 332 MW) reported out since 04-Feb-2012 due to less requisition.          KAKATIYA TPS (UNIT-1 of 500 MW) reported out since 18-Feb-2012 due to boiler tube leakage.          NEYVELI -II STG II (UNIT-1 of 250 MW) reported out since 06-Feb-2012 due to economiser tube leakage.          UDUPPI (UNIT-2 of 600 MW) reported out since 29-Jan-2012 due to PCB clearance awaited.         

Daily Bilateral Trade Summary (State)

Note :- This is a Sample Product.

These charts analyse the State Bilateral Trade scenario for a given date. This analysis is a combination of two charts of which, the first chart shows the states buying power through Open Access while the subsequent one shows the states selling that power to the buying states. In case of no purchase/sale transaction by a state through OA, the same does not appear in the charts at all. In the OA Purchases Chart, starting from the centre, the first layer shows all the traders through whom the power is being purchased. The 2nd layer of the plot shows the states from whom the power is being purchased by these traders & the finally the 3rd layer gives details about the Generators/Utilities from whom that power is being sourced. All volumes mentioned are in MUs. Similar to this, in the OA Sales Chart the first layer shows traders through whom the state is selling its power. The next layer shows the states to whom that power is being sold and the last layer shows the Utility/SEB which is consuming that power. As evident, the size of each section reflects the magnitude of sale/purchase happening through that trader/utility. The overall sales/purchase volume has been mentioned at the centre to give a picture of the overall trade volume though STOA for the state

 

RelatedProducts