INDIA ELECTRON EXCHANGE

         ADANI POWER (UNIT-1 of 330 MW) reported out from 02-Jan-2012 to 08-Feb-2012 due to hydrogen leakage.          ADANI POWER (UNIT-5 of 660 MW) reported out from 05-Feb-2012 to 11-Feb-2012 due to steam leakage.          ANPARA-C TPS (UNIT-2 of 600 MW) reported out since 07-Feb-2012 due to Coal shortage.          BHUSAWAL TPS (UNIT-4 of 500 MW) reported out from 17-Oct-2011 to 09-Feb-2012 due to testing works.          CHHABRA STPP (UNIT-1 of 250 MW) reported out from 07-Feb-2012 to 10-Feb-2012 due to boiler tube leakage.          CHHABRA STPP (UNIT-2 of 250 MW) reported out since 07-Feb-2012 due to turbine trip.          DCRTPP (UNIT-1 of 300 MW) reported out since 03-Feb-2012 due to water valve leakage.          DCRTPP (UNIT-2 of 300 MW) reported out since 25-Sep-2011 due to electrical fault          ESSAR(VADNR) (UNIT-1 of 600 MW) reported out from 25-Nov-2011 to 15-Feb-2012 due to high turbine vibration.          GANDHAR GPP (UNIT-1 of 219 MW) reported out from 01-Feb-2012 to 08-Feb-2012 due to inspection.          GPEC (UNIT-1 of 218 MW) reported out since 01-Feb-2012 due to low demand.          GPEC (UNIT-2 of 219 MW) reported out since 26-Jan-2012 due to low demand.          GURU HARGOBIND TPP (UNIT-3 of 250 MW) reported out since 06-Feb-2012 due to boiler tube leakage.          INDIRA GANDHI STPS (UNIT-1 of 500 MW) reported out since 05-Feb-2012 due to boiler tube leakage.          KAPARKHEDA TPS (UNIT-5 of 500 MW) reported out from 03-Feb-2012 to 08-Feb-2012 due to coal problem.          KOTHAGUDEM TPS (UNIT-9 of 250 MW) reported out from 20-Jan-2012 to 18-Feb-2012 due to annual maintenance.          MEJIA (UNIT-8 of 500 MW) reported out since 08-Nov-2011 due to coal shortage.          NARORA APS (UNIT-1 of 220 MW) reported out from 19-Jan-2012 to 14-Feb-2012 due to turbine Problem.          NATHPA JHAKRI HEP (UNIT-1 of 250 MW) reported out from 05-Feb-2012 to 11-Feb-2012 due to annual maintenance.          NEYVELI -II STG II (UNIT-1 of 250 MW) reported out since 06-Feb-2012 due to economiser tube leakage.          RGPPL (UNIT-1B of 320 MW) reported out from 05-Feb-2012 to 08-Feb-2012 due to steam leakage.          RGPPL (UNIT-3B of 332 MW) reported out since 04-Feb-2012 due to gas shortage.          RGTPP (UNIT-1 of 600 MW) reported out from 05-Feb-2012 to 07-Feb-2012 due to boiler tube leakage.          RIHAND STPS (UNIT-2 of 500 MW) reported out since 06-Feb-2012 due to ID fan problem.          ROSA TPS (UNIT-3 of 300 MW) reported out since 02-Jan-2012 due to testing work.          SIPAT STPS (UNIT-2 of 660 MW) reported out from 24-Dec-2011 to 09-Feb-2012 due to CEP line leakages.          SUGEN CCPP (UNIT-1 of 380 MW) reported out from 04-Feb-2012 to 08-Feb-2012 due to maintenance work.          TPCL (UNIT-5 of 500 MW) reported out from 11-Jan-2012 to 14-Feb-2012 due to Annual overhaul.          TPCL (UNIT-6 of 500 MW) reported out from 05-Feb-2012 to 09-Feb-2012 due to generator protection operated.          UDUPPI (UNIT-1 of 600 MW) reported out from 01-Feb-2012 to 09-Feb-2012 due to unknown reason.          UDUPPI (UNIT-2 of 600 MW) reported out since 29-Jan-2012 due to PCB clearance awaited.         

Error 404!


File Not Found!

Sorry the page you have requested is not available on our website. Please check if the url entered in address bar is correct.
Alternatively you can report this to us at: webmaster@indiaelectron.com