INDIA ELECTRON EXCHANGE

         ADANI POWER (UNIT-1 of 330 MW) reported out from 02-Jan-2012 to 30-Jan-2012 due to hydrogen leakage.          ADANI POWER (UNIT-6 of 660 MW) reported out from 20-Dec-2011 to 16-Jan-2012 due to HP heater tube leakage.          ANPARA-C TPS (UNIT-1 of 600 MW) reported out since 04-Jan-2012 due to generator fault.          BAKRESWAR (UNIT-5 of 210 MW) reported out from 06-Jan-2012 to 31-Jan-2012 due to planned shutdown.          BHUSAWAL TPS (UNIT-4 of 500 MW) reported out from 17-Oct-2011 to 27-Jan-2012 due to testing works.          BUDGE-BUDGE (UNIT-1 of 250 MW) reported out since 10-Jan-2012 due to boiler survey.          DCRTPP (UNIT-2 of 300 MW) reported out since 25-Sep-2011 due to electrical fault.          ESSAR (VADNR) (UNIT-1 of 600 MW) reported out from 25-Nov-2011 to 16-Jan-2012 due to turbine vibration high.          GPEC (UNIT-2 of 219 MW) reported out since 13-Jan-2012 due to low demand.          HARDUAGANJ TPS (UNIT-8 of 250 MW) reported out since 15-Jan-2012 due to fire out.          JKHCL (UNIT-1 of 250 MW) reported out since 15-Jan-2012 due to tripping of outgoing feeders.          JKHCL (UNIT-2 of 250 MW) reported out since 15-Jan-2012 due to tripping of outgoing feeders.          JKHCL (UNIT-3 of 250 MW) reported out since 15-Jan-2012 due to tripping of outgoing feeders.          JPL (UNIT-1 of 250 MW) reported out from 13-Jan-2012 to 16-Jan-2012 due to boiler tube leakage.          KAIGA APS (UNIT-3 of 220 MW) reported out since 12-Jan-2012 due to process parameter.          KOLAGHAT (UNIT-4 of 210 MW) reported out from 14-Jan-2012 to 16-Jan-2012 due to air pre-heater tube leakage.          KOTHAGUDEM TPS (UNIT-11 of 500 MW) reported out since 14-Jan-2012 due to unknown reason.          MEJIA (UNIT-4 of 210 MW) reported out since 14-Jan-2012 due to coal shortage.          MEJIA-B (UNIT-7 of 500 MW) reported out from 29-Dec-2011 to 15-Jan-2012 due to planned shutdown.          MEJIA-B (UNIT-8 of 500 MW) reported out since 08-Nov-2011 due to coal shortage.          NEYVELI -II STG II (UNIT-1 of 250 MW) reported out since 24-Sep-2011 due to maintenance works.          RAICHUR STPS (UNIT-8 of 250 MW) reported out since 06-Jan-2012 due to technical problem.          RGPPL (UNIT-3A of 370 MW) reported out since 13-Dec-2011 due to gas shortage.          RGPPL (UNIT-3B of 370 MW) reported out since 12-Dec-2011 due to gas shortage.          ROSA TPS (UNIT-3 of 300 MW) reported out since 02-Jan-2012 due to testing work.          SIPAT STPS (UNIT-2 of 660 MW) reported out from 24-Dec-2011 to 16-Jan-2012 due to CEP line leakages.          SUGEN CCPP (UNIT-2 of 382 MW) reported out since 30-Dec-2011 due to low demand.          SURATGARH STPS (UNIT-6 of 250 MW) reported out since 02-Sep-2011 due to turbine problem.          TROMBAY (UNIT-5 of 500 MW) reported out from 11-Jan-2012 to 14-Feb-2012 due to annual overhaul.          UDUPPI (UNIT-2 of 600 MW) reported out since 03-Jul-2011 due to pollution control board clearance.         

featuredproducts

Bilateral Trade Summary (Region)

The above charts try to give a detailed overview of the Bilateral Trade scenario in the Region, for ... [more]

BILATERAL TRADE HISTORY OF GENERATORS

The above chart gives a summarized picture of the key Generators across the country, by sharing thei... [more]

Daily Bilateral Trade Summary (State)

These charts analyse the State Bilateral Trade scenario for a given date. This analysis is a combina... [more]

POWER JOKES


Fax it to me. (Meaning: I'm too lazy to write it down.)

JOIN US ON SOCIAL MEDIA

Power Sector Snapshot

up

news &events

  • GERC dismisses solar developers petitions  [more]
  • NTPC looking for long-term fuel supplies  [more]
  • BHEL profit jumps 14% to Rs 3,660 cr  [more]
  • Spending power of Indian consumers to Hit $1 T by 21  [more]
  • Dividend pressure works on central PSUs  [more]
  • Big jump in renewable energy trading in January  [more]
  • Management of energy demand  [more]
down
  • Free Newsletters
  • Free SMS
  • Online Trial
  • Give us your email address and we will mail you a limited number of paid newsletters (iGRID Newsletters) Free.

    Click to reload image =
    Note:Click above image to get new calculation.

    Give us your mobile number and we'll send you a Daily Power Market Updates (iGRID Alerts) as SMS Free

    Click to reload image =
    Note:Click above image to get new calculation.

    Experience our Online Portal (iGRID Live) and get a feel of the services you get with different level of usage rights. Use the Register link at the top and Login using those details. Else click the link below. Free.